Stages of Production Line

Forming

Forming the top and bottom sheets of sides and the middle to give the end formation of the walls and roof 5 or 3 ribs

Ovens

heating of the upper and lower sheet from 30° till 40° to be ready to receive the foam mixture to increase the adhesive between sheets and foam

Pour the mixture

pouring foam on the bottom sheet with specific quantity and ratio to matching the required density and thickness

Double built

receiveing the top and lower sheet after heating with foam to press accoring to required thickness under a special conditions

SAW

cutting the panels after exit from double built with required lengths according to client request

Stacker

carrying and transfer panels after cutting and stack them in bundles

Packaging

Packaging the received bundles by nylon for storage and then load trucking clients

Stages of Production Line

  • Forming

  • Ovens

  • POUR THE MIXTURE

  • Double built

  • Saw

  • Stacker

  • Packaging

CONTACT Us

Recent News

  • 01 July 2014

    our new website is finally online ... more

  • 20 June 2014

    Alnajah participated to the Libya build fair in Tripolimore